PIONEER ATHLETIC CENTER BUILD OUT UPDATES!
January 15, 2022

“We could improve the town and our athletes”
It took a lot of vision of what “could be”. Significant investment into a facility to help elevate the neighborhood and town and provide a first class facility for residents, customers & athletes! We know what it can be.
March 15 2022

Our plan is approved by the Town!
We can’t wait for the amount of parking for all of our customers and the opportunity this offers all of our athletes!
April 12, 2022

Working through the “how”, “What fits” and “how does it flow best”. Iteration #5
It can be a lot of things, but how do we make it the best it can be!
May 25 2022

We need to make it perfect.
Well this isn’t it but we’re still trying!
August 1, 2022

Iteration 1,001,023
It can be a lot of things, but how do we make it the best it can be!
Aug 14 2022

Close to Final gymnastics Gym Design!
Aug 14 2022

Final gymnastics Gym Design!
August 15, 2022

The Closing
We’re happy to announce on August 15th, after 7+ months of waiting, we received the keys to the building. No time for Champagne bottles, Let’s get to work!!
Sept 5th, 2022

Second Floor Mezzanine Removal Begins
In the gymnastics area, a 13,600 square foot 2nd floor mezz needs to be removed to allow the 18′ + ceiling height + for gymnastics. Before this picture this facility was full of machinery and inventory.
Sept 15 2022

Progress started near the viewing area
Excited to see the 2nd floor coming down, opening the gymnastics area up!
Sept 15 2022

Progress started near viewing area
Excited to see the progress looking out from the viewing area!
Sept 20 2022

Metal Coming Down!
The structure holding the second floor coming down!
Sept 24 2022

Significant Progress opening up the gym
A lot of light bulbs (we’re recycling everything!) and gym space coming! 80 feet wide and 170 feet long!
Sept 26 2022

13,600 square feet of Openness! Entire 2nd floor Mezzanine is down!
beyond exciting! All electrical to be removed. Windows, Doors, HVAC all to be replaced! The vision is coming together!
Sept 27 2022

Exterior concept design Begin (1st version)
A major facelift will be completed in spring of ’23. Version 1 of many!
Sept 27 2022

Exterior Concept Designs Begin
A major facelift will be completed in spring of ’23. Version 1 of many!
Sept 29 2022

2nd Floor Interior Modeling for Construction Team
Lots of details, but it’s exciting! Dedicated party rooms, viewing Area on both sides, Dedicated Taekwondo Gym and Ninja Obstacle Gym!
Sept 29 2022

Equipment is Arriving
New in-ground Trampolines are arriving!
10/25/2022

5 Ton Equipment Lift
Massive effort to remove a large 5 ton crane from the roof truss. The building can breath a sigh of relief!
12/10/2022

Loading Docks becoming Bathrooms
Exciting to see progress
12/15/2022

Pits Are Cut, first scoops of dirt are out!
It’s an exciting time!
12/22/2022

Pit Walls are Being Prepped!
2 Trampolines, a 34′ Tumbl trak and an 18×18 foam pit will live here soon!
12/29/2022

Pit Floors & Walls are being Poured
it doesn’t look like fun right now but when 5,000+ cubes of foam fill this hole with the 2 trampolines and tumbl trak, it’s going to be epic!
1/15/2023

Loading Dock Demo
Make way for new drop off entrance, the loading dock has been removed
1/20/2023

2nd inground pit is Dug!
The airbag pit has been dug! Now to pour the floors and then form the walls! This will hold a state of the art bigairbag training pit!
1/30/2023

Framing all Rooms
All framing is nearly complete!
2/1/2023

Competitive Team Pit is complete
Time for a big air bag and some flipping (well not yet)
2/15/2023

Custom Tramp Pit is being outfitted
Tumbl Traks and trampolines oh my.
3/5/2023

Entrance is built, ready for the outside facelift and glass doors and windows!
We’re here to make a difference when you walk through the doors, why not make it a grand entrance
3/6/2023

Big Air Bar, Big skills
Bring on the painting and then installation of the big air bag!
3/10/2023

State of the Art Air Conditioning and Heat!
We’ve been waiting for this moment for a loooooong time. Bring on the ceiling paint!
3/12/2023

Wall Paint Starting!
Lets clean this place up!
3/13/2023

Ceiling Is fully Painted
Windows are in, Ceiling is painted. Let’s finish the walls and hang the lights! This room is almost ready for equipment and athletes!
3/20/2023

Windows Are In!
It May not look like much now, but all the new windows are in and when the outside is completed later this spring it’s going to be a huge upgrade to the town!
3/25/2023

New 2 Story Window being installed!
Going from no natural light to a building with large windows is going to make it feel more like home!
3/31/2023

Our Front Desk Getting Installed!
4/1/2023

Paver Entrance Being Install
We’re going above and beyond to make this a place everyone is proud to be apart of. Exterior siding coming up next!
4/3/2023

Parking Lot being Prepped For Paving
It’s coming together quickly now!